Monday, 28 November 2011

More Guildhall!

With both the pre and post renovation models of the guildhall complete and half-furnished, animation can begin. The two other members of the group, Polly and Kat, have models that will be merged into this file to add more objects inside and around the building.

Pre-Renovation Guildhall
  • A dirtier texture was used on the walls. 
  • The doors, windows, interior walls and stairwells match the blueprints.
  • There are two chimneys.
  • The roof is flat against the side walls.
  • There is little to no furnishings inside.








Post-Renovation Guildhall
  • The walls are now a cleaner white to give a newer effect.
  • The doors, windows, interior walls and stairwells have been changed to match the proposed blueprints.
  • One chimney has been removed.
  • The roof now has the indentation shown in the proposed drawings.
  • The building has been filled with bookcases, computer desks, display cases etc.






No comments:

Post a Comment